wp-statistics
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nexusnew/nigerdeltanews.ng/wp-includes/functions.php on line 6114wordpress-seo
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nexusnew/nigerdeltanews.ng/wp-includes/functions.php on line 6114advanced-ads
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nexusnew/nigerdeltanews.ng/wp-includes/functions.php on line 6114Darkness looms in Abuja, Nasarawa, Niger, and Kogi states as the Transmission Company of Nigeria (TCN) has issued the Abuja Electricity Distribution Company (AEDC) a five-working-day disconnection notice over non-compliance with the provisions of the Market Rules.<\/p>\n
This is according to a disconnection notice signed on Friday by TCN\u2019s Market Operator, Ali Ahmad.<\/p>\n
TCN stated that the proposed disconnection date is July 28, 2024.<\/p>\n
Accordingly, TCN noted the disconnection will be done at the 33kV feeder from the 132\/33kV Katampe 1 Transmission Station and Feeder 3 from the 132\/33kV Central Area Transmission Station.<\/p>\n
\u201cThe Market Operator hereby issues a disconnection order for Abuja Electricity Distribution Company (AEDC) for its non-compliance with the provisions of the Market Rules.<\/p>\n
\u201cThe defaulting Market Participant, AEDC, has been duly notified of their infractions concerning non-compliance with Section 15.3.3.a of the Market Rules.<\/p>\n
\u201cNewspaper publication has been made in line with the application of the Rules, which gives AEDC a deadline of five (5) business days from the date to remedy its Market Rules infractions.\u201d<\/p>\n
Darkness looms in Abuja, three states as TCN issues AEDC disconnection notice<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"
Darkness looms in Abuja, Nasarawa, Niger, and Kogi states as the Transmission Company of Nigeria (TCN) has issued the Abuja…<\/p>\n","protected":false},"author":1,"featured_media":42617,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4660,9248,4161,15,3931],"tags":[32,9250,519,17240,21456,1051,3502,180,20236,2328,3936,332],"class_list":["post-42616","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-abuja","category-aedc","category-business","category-news","category-tcn","tag-abuja","tag-aedc","tag-business","tag-darkness","tag-disconnection","tag-issues","tag-looms","tag-news","tag-notice","tag-states","tag-tcn","tag-three"],"yoast_head":"\n